A rapid mobilisation

Malin React are concluding a very rapid and extensive mobilisation of subsea equipment onto the vessel Siem Dorado at Port of Blyth for Helix Robotics Solutions.

The project leveraged the full turnkey capability of Malin React including engineering, fabrication and installation in under 3 weeks while implementing COVID-19 separation requirements throughout.

We wish the crew a safe transit…